Construction company in Dubai

OutMazed Design is a Dubai construction company for the works that change a villa or its plot: extensions and alterations, the structural, masonry, waterproofing and MEP works inside a renovation, and the pools, garden structures and parking areas outside, designed in 3D and built by our own team with the approvals handled by us.

Free site visit · Approvals handled by us · Designed in 3D

WHAT A

What a construction company does on a Dubai villa

Most construction work on a Dubai villa happens around an existing house rather than on an empty plot: a room added into the garden, a balcony rebuilt to carry living space, a boundary wall redesigned, a pool dug and shelled, a parking area or car shade built, a roof or wet area waterproofed, or the structural and services work that a deep renovation needs before any finish goes on. These jobs share the same demands. Someone has to confirm what the existing structure can carry, bring water, drainage and power to the new work, keep the villa usable while it happens, and get the developer, community or authority approvals before the first block is laid. That is the work we take on as a construction company, and we do it with the same in-house team that handles the design and the finishing, so the structure is planned around how the finished space will be used.

CONSTRUCTION WORK

Construction work we take on

These are the forms construction most often takes on villas and commercial premises in Dubai. Every project starts with a site visit and a scope review before anything is priced.

01

Villa extensions and alterations

Ground-floor rooms built into the garden, enclosed balconies and terraces, structural balcony extensions and upper-floor additions where the structure below can take the load. See villa extension design and build.

02

Structural and civil works inside a renovation

Removing or adding walls, new openings and lintels, new slabs and staircases, and the masonry and blockwork that a replanned villa or a villa renovation depends on.

03

Pools and garden structures

Excavation and the concrete shell of a swimming pool, plus the gazebos, pergola bases, sunken seating, retaining and boundary walls and paving of a landscape build.

04

Parking, shades and external works

Custom-built parking areas, car parking shades, driveways and the external walls and finishes that face the street.

05

Waterproofing and MEP

Roof, terrace, bathroom and pool waterproofing, and the electrical, plumbing and cooling works that new rooms and structures need.

06

Commercial and fit-out civil works

The civil side of an office, retail or restaurant project: partitions and openings, floor build-ups, drainage for kitchens and bathrooms, and making good before the fit-out team moves in.

WHAT GETS

What gets decided before we build

Structure, services and approvals, in that order

The first question on any construction job is structural: what the new work stands on and whether the existing foundations, columns and slabs can take it, or need new support. That answer sets the size of an extension, the depth and position of a pool, and how long the garden or a part of the house is out of use. The second question is services. New rooms need power, lighting and cooling, a new bathroom or outdoor kitchen needs water and drainage with enough fall to reach the existing lines, and a pool needs a plant room and a route for its pipes. Cooling matters more in Dubai than almost anywhere, because an added room can push an existing AC system past what it was sized for.

The third question is approval. Almost every community controls what can be added to the outside of a villa, and some works also need an authority permit. We design with those rules in mind from the first drawing and apply for the approvals ourselves; see building management and community NOC. Only when structure, services and approvals are settled does the work go to site, which is also when the quotation can be exact.

The same villa front after the works: light in colour, with columns and a pediment, Project Majestic, Al Twar
The same villa front after the works: light in colour, with columns and a pediment, Project Majestic, Al Twar
WHY ONE

Why one team for design, construction and finishing

  • The structure is planned around the finished roomBecause the people who design the kitchen, bathroom or garden sit with the people who build the shell, openings, services and levels are set for the final layout, not corrected afterwards.
  • One project manager and one quotationThere is no gap between a builder's scope and a finishing contractor's scope, and no dispute over who makes good what.
  • Approvals done onceStructural, external and services changes go into one application set for the community or authority, prepared by the team that will carry them out.
  • Joinery from our own workshopDoors, wardrobes and kitchens for the new rooms are made in our own workshop, so the construction programme and the fit-out programme are planned together.
CONSTRUCTION IN

Construction in our projects

HOW A

How a construction project runs with us

01

Project Study

A free site visit to understand what you want to build, measure the villa and plot, and look at the existing structure, services, access and the drawings you already have.

02

Plan

We agree the scope, the structural approach and the services the new work needs, and we apply for the approvals your community or the authority requires.

03

Visualization

You see the extension, pool or external works in 3D, inside and from the street, before construction starts.

04

Execution

Our in-house team builds, waterproofs, connects and finishes the work, with one project manager as your contact from the first block to handover.

WHAT CHANGES

What changes the cost of construction work

Every project is priced after the site visit and the design. These are the main drivers.

  • Structural scopeNew foundations, strengthening of the existing frame, or building over an existing slab.
  • Excavation and ground conditionsPools, sunken areas and new footings depend on what is under the garden and how machinery can reach it.
  • ServicesRooms with water and drainage cost more than dry rooms; a pool adds a plant room and pipework.
  • CoolingWhether the existing AC can serve new rooms or new equipment is needed.
  • Access and working conditionsA corner plot with side access is simpler than a villa where everything passes through the house.
  • Finishes inside and outMatching the existing villa's render, stone or tiles, and the level of finish in the new rooms.
SCOPE AND

Scope and approvals

Construction feasibility and permissions are project-specific. A new build, an extension or an alteration is assessed on its site, its drawings and the rules of its community before we confirm scope, responsibilities and a quotation; this page is an invitation to discuss the brief, not confirmation that a proposed work is permitted. Extensions, masonry, waterproofing, MEP and parking shades are part of our civil construction service, and the turnkey route adds the interior design and finishing to the same contract.

FAQ

Questions and answers

Are you a construction company or an interior design company?

Both, with one team. The construction side covers extensions, structural and civil works, pools, garden structures, waterproofing and MEP; the design side covers the 3D design and the interior finishing. Most of our projects use both.

Do you build new villas from the ground up?

New-build enquiries are assessed project by project on the site, the drawings and the approvals involved. Share what you have and we will tell you after the review whether and how we can take it on.

Who applies for the approvals?

We do, as part of the project. Which approvals apply depends on your community and on the scope: developer or community management NOCs for changes to the outside of a villa, and an authority permit where the work requires one.

Can we stay in the villa during construction?

Often, for an extension or garden works, because the work is outside the main living areas and we phase the noisy and dusty stages. For structural changes inside the house we look at this at the site visit and plan the sequence around it.

Do you take on the civil works only, with another contractor finishing?

Our standard route is design, construction and finishing together, because it removes the gaps between scopes. Where a project genuinely needs only the civil works, we discuss it at the scope review.

How is the work priced?

After the free site visit and the design, as a written quotation covering the agreed scope, with structure, services, approvals and finishes itemised so you can see what each part costs.
GUIDES

Guides and ideas

RELATED

Related services

CONTACT US

Contact Us

Ready to bring
your vision to life?

Get in Touch

We appreciate your interest in OutMazed ® Design and would be delighted to assist you with your design requirements. Our team of professionals are committed to providing you with the highest standard of service and satisfaction possible.

Please feel free to contact us and let us know what you're interested in or looking for. We are here to assist you whether you need help with a new project, renovation, or just some design advice. Fill out the contact form below, and one of our staff will contact you as soon as possible.

Alternatively, you can also reach us via phone or email, and our friendly staff will be happy to help you. We encourage you to take the first step towards transforming your space with OutMazed ® Design by contacting us today.