What drives kitchen renovation cost in Dubai

Two kitchens of the same size in the same Dubai community can cost very different amounts to renovate, because the figure follows what is moved, what is made and what is hidden behind the old cabinets. This guide explains the factors that decide kitchen renovation cost, with no price list, so you know what to settle before you ask for a quotation.

Free site visit · Approvals handled by us · Designed in 3D

WHY A

Why a kitchen has no standard price in Dubai

A kitchen is the room where water, drainage, power, gas and extraction all meet, and each of them can stay where it is or move. Dubai homes add their own variables: many villas have a closed kitchen that owners want to open to the dining room, some have a second back kitchen for the heavy cooking, and apartments come with building rules about what may be altered. So the cost is set less by floor area than by a short list of decisions. This page walks through them for a full kitchen renovation in a villa or an apartment. For the house as a whole, see our guide to villa renovation cost factors.

LAYOUT CHANGES

Layout changes and moving the services

The first question is whether the new kitchen keeps the plan of the old one.

01

Keeping the sink, hob and fridge in place

When each appliance stays on its existing water, drain and power point, the work behind the cabinets is light and the budget goes into what you see. It is the calmest route in an apartment, where the drain position is usually fixed by the building.

02

Moving the sink or adding an island

A sink on an island or on another wall needs a new drain run with a fall, which in a villa can mean cutting a channel in the floor and making it good. An island with a hob or sockets needs power brought across the floor as well. Our plumbing works team checks where the drainage can run before the layout is fixed.

03

Opening a closed kitchen

Taking out the wall to the dining room means the floor, ceiling, lighting and air conditioning of two rooms have to read as one. Whether the wall can come out depends on the structure and on what the developer or community management allows.

04

Gas and the hob

Many Dubai villas cook on cylinder gas with the cylinder kept outside, while some towers have piped gas and others allow electric hobs only. Moving a gas hob means moving the pipe and its shut-off, a cost item of its own.

05

What the strip-out reveals

Older villas often hide tired pipework, damp plaster from an old leak or uneven walls behind the cabinets. Putting these right while the room is empty is the part of the budget nobody can see in advance.

CABINETS: USUALLY

Cabinets: usually the largest line

How they are built and what covers them

Cabinet cost follows length, height and what is inside. A run of base units with shelves is simple. The same run with deep drawers, corner mechanisms, a tall larder and wall units taken up to the ceiling has far more parts, and hinges and drawer runners that survive daily use are a real share of the bill. The carcass matters in this climate: a Dubai kitchen is air-conditioned for most of the year, but the unit under the sink, a back kitchen and a home closed up over the summer all see moisture, so the board and its edge sealing need to cope with it.

The fronts then set the look and move the figure again. Flat laminate, lacquer, veneer, framed doors and handleless profiles each take a different amount of workshop time, and a handleless kitchen needs more accurate making and fitting than one with bar handles. We design and make custom kitchen cabinets in our own joinery, built around your appliances, sink and worktop, so the sizes follow the room and awkward corners are used instead of filled.

Galley kitchen with handleless units, warm plinth and under-cabinet lighting and a white marble-look worktop and splashback, Project Mudon, Arabella, Mudon
Galley kitchen with handleless units, warm plinth and under-cabinet lighting and a white marble-look worktop and splashback, Project Mudon, Arabella, Mudon
WORKTOPS, APPLIANCES

Worktops, appliances and finishes

After the cabinets, these choices move the total most, and the gap between the modest option and the ambitious one is wide.

01

Worktop and splashback

Engineered stone, natural stone, porcelain slab and solid surface differ in material cost and in how hard they are to cut and join. The details add up: waterfall ends on an island, a full-height splashback in the same slab, an undermount sink cut-out and the number of visible joints.

02

Appliances

Freestanding appliances slide into gaps. Built-in ovens, an integrated fridge and a dishwasher behind a cabinet door need housings made to their exact sizes. Decide early whether existing appliances are refitted or replaced, because the cabinets are drawn around them.

03

Floor and wall finishes

Large tiles need a flat base, which older screeds do not always give, and in an open kitchen the floor has to match or meet the living room, so the decision spreads across the ground floor. Our kitchen flooring page covers surfaces that cope with water and heavy use.

04

Electrical points and lighting

A modern kitchen asks more of the wiring than the one it replaces: separate circuits for the oven and hob, power on the island, and lighting under the wall units. In an older villa the distribution board may need attention before it can take the load.

05

Extraction and cooling

A hood that vents outside needs a duct route, which on an island runs through the ceiling. Where a wall comes down, the air conditioning has to be rebalanced so cooking heat does not sit in the living room through a Dubai summer.

APARTMENT OR

Apartment or villa, and living at home during the work

The same kitchen costs different amounts to build in different buildings, for reasons that have nothing to do with the cabinets.

  • Approvals in an apartmentBuilding management and the developer may require a no-objection certificate and drawings before work starts, and changes to plumbing, electrics or walls can need the authority's permit as well. On a turnkey apartment renovation the applications are made for you.
  • Access and working hoursA tower usually sets permitted working hours, a service lift to book and rules for protecting corridors and removing debris, and worktop slabs have to fit that lift. A gated villa community can also limit noisy work to certain hours.
  • Staying in the homeLiving in the house while the kitchen is out means dust protection, a temporary sink and hob elsewhere, and work phased so water and power are off as briefly as possible. That care is labour. Our guide to living through a villa renovation covers how to plan for it.
  • A kitchen as part of a larger projectWhen the kitchen is renovated with the bathrooms, floors and ceilings, the trades, the protection and the approvals are shared across the house. Owners planning more than one room often find a turnkey villa renovation under one contract simpler to budget than a series of separate jobs.
HOW THE

How the same factors apply to a bathroom

A smaller room with the same logic

Bathroom renovation cost is decided the same way. Keep the toilet, basin and shower on their existing drains and the budget goes into tiles and fittings; move them and the floor comes up for new pipework. Waterproofing takes the place that cabinets hold in a kitchen: it is invisible, it cannot be skipped, and in an apartment a failure shows up in the neighbour's ceiling. Dubai adds its own points, such as a water heater above the bathroom ceiling that is worth checking while the ceiling is open.

The visible choices then work like worktops and fronts. Large-format tiles, wall niches, a glass screen, concealed mixers and a made-to-measure vanity each add material and labour over their simpler alternatives. A bathroom renovation starts with what sits behind the tiles, and it is often sensible to do the bathrooms and the kitchen together, because they share the plumber, the tiler and the days when the water is off.

Bathroom with large grey veined wall tiles, a black-framed glass shower screen, matte black fittings and warm-lit wall niches, Project Celine, Mudon
Bathroom with large grey veined wall tiles, a black-framed glass shower screen, matte black fittings and warm-lit wall niches, Project Celine, Mudon
HOW TO

How to get a figure you can rely on

A figure given over the phone can only be a guess, because none of these factors can be seen from a description. Decide the layout, the cabinet finish, the worktop and the appliance list first, and have the drain, power and extraction routes checked on site. A drawn kitchen design turns those decisions into something every contractor prices in the same way, and it lets you move cost deliberately: a simpler front here, a better worktop there. Then check that each quotation includes the strip-out, the services changes, the approvals and the making good. Our guide on how to compare renovation quotes shows how to read them line by line.

KITCHENS FROM

Kitchens from our projects

FAQ

Questions and answers

What is the biggest factor in kitchen renovation cost?

Usually the cabinets, followed by the worktop and the appliances. How far the sink, hob and power points move comes next, because every move adds plumbing, electrical and making-good work behind the finishes.

Is it cheaper to keep the existing kitchen layout?

Yes, as a rule. When the sink, hob and fridge stay on their existing points, the services work is light and the money goes into cabinets and surfaces. A new layout is worth its extra cost when the old one does not suit how you cook or how the room connects to the dining area.

Does an apartment kitchen cost more to renovate than a villa kitchen?

Not necessarily, but the make-up differs. An apartment kitchen is often smaller, while building management approvals, lift bookings and restricted working hours add time and preparation. A villa kitchen is easier to reach and is often larger, with more scope to move walls and services.

Do I need approval to renovate a kitchen in Dubai?

It depends on the property and the work. A like-for-like cabinet change may need only the building's or community's consent to bring contractors in, while moving walls, plumbing or electrics may need a no-objection certificate and a permit. Ask the developer or community management what applies to your home.

Why do quotations for the same kitchen differ so much?

Because each contractor has assumed a different cabinet construction, worktop, appliance fit and amount of services work, or has left something out. A drawing and a written specification given to all of them removes most of the difference.

Does bathroom renovation cost follow the same factors?

Largely, yes. Moving the toilet, basin or shower, the waterproofing, the tile size and the type of fittings and vanity do for a bathroom what layout, cabinets and worktop do for a kitchen.
GUIDES

More guides

SERVICES

Our related services

CONTACT US

Contact Us

Ready to bring
your vision to life?

Get in Touch

We appreciate your interest in OutMazed ® Design and would be delighted to assist you with your design requirements. Our team of professionals are committed to providing you with the highest standard of service and satisfaction possible.

Please feel free to contact us and let us know what you're interested in or looking for. We are here to assist you whether you need help with a new project, renovation, or just some design advice. Fill out the contact form below, and one of our staff will contact you as soon as possible.

Alternatively, you can also reach us via phone or email, and our friendly staff will be happy to help you. We encourage you to take the first step towards transforming your space with OutMazed ® Design by contacting us today.